worldwide
 
         
 

Eli-Lilly Services S.A - Validated Purified water system

New USP28 validated purified water system required to serve the Pharmaceutical actives and laboratory areas.

Scope of plant supply:
Puretech Genesys generation plant (sized to provide 1,800 l/hr 24 hrs/day) and pre-treatment, stainless steel vessel, plant skid including –  pumps, control panel, heat exchanger,  on-line measurement and control devices,  ozone generation and destruction with UV disinfection. Sub-loop for laboratory areas.


pdf Click here to download the full PDF of this case study.